A strong office relocation survey combines pre-move expectations with post-move feedback across space, IT, facilities, wellbeing, communication, safety and operational continuity. In Australia, 72% of organisations plan to increase investment in space design and fit-outs, while 83% rank location as their top priority when renewing a lease.

Ask the right question before the boxes move: does each answer lead to a decision, or are you just collecting opinions? A relocation survey becomes useful when it shows which teams need more meeting space, where technology is failing, whether the commute has become harder, and which concerns require an owner.

Run a baseline before the move, then use focused follow-ups after employees have worked in the new office. Keep response scales consistent, offer anonymous responses where appropriate, segment results by department and work arrangement, and explain how managers will share results and assign actions. The ten themes below cover space needs, commute and accessibility, IT, safety, facilities, wellbeing, collaboration, communication, costs and overall satisfaction.

Feedback should measure both what employees expected and what they actually experienced.

For practical technical preparation, businesses can also review these ITAD steps for office moves.

1. Employee Satisfaction With New Office Location and Facilities

Employees may accept a new address but still struggle with the daily experience inside the building. Ask them to rate desk space, lighting, temperature control, noise, amenities, private areas and the overall work environment. A 5-point scale from very dissatisfied to very satisfied makes results easier to compare across teams and across survey rounds.

Ask the same or closely related questions before and after the move. Before relocation, employees might rate how important natural light, quiet work areas or client facilities are. After relocation, they can rate whether the new office delivers those features in practice. That comparison identifies expectation gaps more clearly than a single satisfaction score.

CBRE's 2025 Australian Office Occupier Survey found that 77% of organisations considered improved amenity and services essential before considering a relocation. The survey also reported that 53% of employees now sit in unassigned seating, compared with 30% in 2019, while average desk density had fallen to 0.7 desks per employee. Those figures support questions about assigned desks, shared seating, collaboration zones and amenities rather than questions limited to office size.

Questions that produce usable facilities feedback

  • Overall satisfaction: How satisfied are you with the new office environment?
  • Workstation suitability: Does your desk or shared workstation support your normal tasks?
  • Environmental comfort: How would you rate lighting, temperature and noise?
  • Open comment: What one physical feature should facilities address first?

Survey employees within 2 to 4 weeks of relocation, when initial impressions remain clear. Segment responses by department, because a legal team, creative team and client-facing team may need very different environments.

A professional woman smiling while adjusting her computer monitor on a clean, modern office desk.

2. Communication and Change Management Effectiveness During Relocation

Was each message clear enough for employees to act on it? A relocation can feel disorganised even when the physical move follows plan. Staff need timely information about the new address, access arrangements, parking, public transport, seating, department locations, equipment and the date normal operations will resume.

Measure communication against the decision employees had to make at each stage. Ask whether the message arrived early enough, was easy to find and answered the practical question at hand. Use one consistent scale, such as very unclear to very clear, with a not applicable option. Add a channel question so managers can see whether email, intranet updates, team briefings or another format worked.

A short sequence across the move lifecycle gives more useful results:

  • Before the move: Did you understand why the organisation was relocating and what would change for you?
  • During the move: Did you know where to report access, equipment or safety problems?
  • After the move: Could you find the teams, rooms and services you needed?

Link collection dates to the office relocation timeline so communication owners can check each result before the next operational milestone. Survey before the move, during the active transition and shortly after reopening. Keep the questions comparable, but give remote and field staff a separate response option when standard office messages do not apply.

Interpret results by work pattern and location. Employees may understand an email but miss an intranet update, while field staff may need mobile instructions. A Melbourne corporation could test knowledge of the new address, parking and public transport. A healthcare provider could ask about equipment relocation and continuity arrangements. A financial services team might measure confidence in the moving timeline and individual responsibilities.

The response should point to an owner and an action. Low clarity about parking calls for better access information. Low confidence about equipment responsibilities calls for named owners and a central move guide. Low scores across channels indicate late communication or overreliance on one format.

3. Impact on Productivity and Operational Continuity Post-Relocation

Productivity questions should connect employee experience with the work each department performs. A customer service centre might ask whether call handling remained practical. A law firm could ask whether staff could access matter files and complete billable work. A head office might ask whether internal systems, inventory information and client communications remained available.

Start with a baseline before the move. Record the operational measures that managers already use, such as calls handled, projects completed or response times. The survey shouldn't replace those measures. It should explain what employees experienced and why performance changed.

Ask respondents to rate the impact on a scale such as major negative impact to major positive impact, with no material impact in the middle. Follow that rating with a precise question about the cause:

  • Technology disruption: Did system access or connectivity interrupt your work?
  • Physical disruption: Did you lose time finding equipment, files or supplies?
  • Process disruption: Were approvals, handovers or team communications delayed?
  • Recovery: What remains slower than it was before the move?

Survey once within 2 to 6 weeks after the relocation, then repeat at 3 months to distinguish temporary disruption from a lasting problem. Segment responses by function. A short-term inconvenience for an administrative team may represent a serious continuity risk for a customer-facing operation.

Where responses identify downtime, finance and operations managers should calculate its business impact using the organisation's own internal data. Don't ask employees to guess the dollar cost. Ask what happened, when it happened and how often it affected their work.

A specialist office equipment relocation service can form part of the operational plan when equipment handling, access and scheduling need to be coordinated.

4. Accessibility and Commute Impact of New Office Location

The new office may look better on a floor plan while making daily travel harder for part of the workforce. Ask about the change in commute time, travel mode, distance, cost, reliability and convenience. Measure parking separately from public transport, because a location can be well served by trains yet difficult for employees who drive or need accessible parking.

Use questions that allow comparison rather than vague impressions:

  • How has your commute time changed?
  • How has your usual travel mode changed?
  • Is the new location easier or harder to access?
  • How reliable is your main transport option?
  • How satisfied are you with parking availability and cost?
  • Can you enter, move through and work in the building comfortably?

A Perth-based employee survey examined commute mode, frequency, time, distance, cost and convenience at each office location. After a move to a CBD office, car dependence decreased and satisfaction with commuting options increased, according to the employee commuting behaviours research. Separate Australian research reported that commuting satisfaction diminished as travel distance and weekly commuting expense increased.

Segment the commute results

Compare full-time, part-time and flexible workers, then group responses by employee location zones. Don't publish small-group results in a way that could identify individuals. The aim is to identify patterns, such as a difficult route for outer-suburban staff or a parking problem affecting employees with mobility needs.

Ask one follow-up about work-life impact. Employees may tolerate a longer commute if public transport is reliable, but an unpredictable journey can affect family commitments and office attendance. Managers should use the findings to consider parking support, flexible start times, transport information, accessibility improvements or a review of attendance expectations.

5. Technology Infrastructure and IT System Functionality in New Space

A successful technology survey connects each reported fault to its location, timing and operational effect. Ask staff about the new office during early occupancy, then repeat the relevant questions after IT has made corrections. This separates a setup problem from an ongoing infrastructure problem.

Use a five-point satisfaction or reliability scale for internet speed, Wi-Fi, phone quality, printer access, video conferencing and cloud services. Add a frequency response for interruptions and a location field covering the floor, meeting room, zone or workstation area. “The internet is poor” produces little direction. “Wi-Fi fails near the training room during video calls” identifies a practical starting point for IT.

The survey can follow this sequence:

  • Reliability: How often does connectivity interrupt your work, and how much time does each interruption typically disrupt?
  • Coverage: Which areas have weak or unavailable Wi-Fi?
  • Equipment: Were your workstation, monitor, phone and peripheral setup ready when you needed them?
  • Remote connection: Can you collaborate reliably with colleagues working elsewhere?
  • Access: Can you use the software, licences and cloud services required for your role?
  • Security: Do you know how to report a technology or data access issue?

Ask employees to rate impact separately from technical performance. A short outage may be tolerable for one role but stop another from serving clients. Segment results by team, work pattern and office zone, while protecting small groups from identification. IT staff should receive a separate version covering infrastructure capacity, cabling, server arrangements, network configuration and recovery procedures.

For equipment and systems that require careful handling, coordinate the survey with server relocation specialists. Teams checking wireless performance can use managed Wi Fi surveys UK as a reference for structured assessment methods. Repeat unresolved questions after troubleshooting to confirm whether the intervention addressed the original problem.

A desktop computer setup with a monitor, keyboard, mouse, and ethernet cable on a wooden office desk.

6. Cost and Budget Impact of Office Relocation Process

Employees don't need every line of the relocation budget, but they do need enough context to judge the decision fairly. Ask whether they understand the business reason for the move, whether the new location provides value and whether cost-saving measures affected the workplace experience.

A premium Melbourne CBD office, for example, may support client access and recruitment while creating pressure on rent, parking or space allocation. A manufacturing business may value improved warehouse functionality more than presentation. A professional services firm may view client meeting facilities and brand perception as important benefits. The survey should allow employees to distinguish the cost from the benefit they personally experience.

Use neutral questions:

  • Do you understand the main reasons for the relocation?
  • Do you believe the new office provides good value for the company?
  • Do you feel the relocation was a sound business decision?
  • Which benefits have you experienced in your work?
  • Did cost-saving measures reduce comfort, access or productivity?
  • What investment would improve the value of the new location?

Share high-level context before asking for an opinion. Don't invite employees to assess value without explaining the intended business outcomes. At the same time, avoid leading questions that imply the move must be considered successful.

Australian office-market commentary points to tenants consolidating space and selecting fitted, higher-quality buildings while vacancy remains high. Coverage of Australian mobility and office-market conditions supports a broader commercial question set, including floorplate suitability, lease timing, access constraints and phased moves.

Keep perceived value separate from actual financial performance. Finance can assess the budget, while employees can explain whether the promised operational benefits are visible in daily work. For cost-planning context, review the office relocation cost guide.

7. Safety, Security and Risk Management in New Location

Safety questions should identify a specific action or control, not only ask whether employees feel safe. A broad rating can show where concern exists, while targeted questions reveal whether the problem involves evacuation, access, physical hazards, privacy or technology.

Start with a short scenario: “If an emergency occurred today, how confident would you be about what to do?” Follow with questions that connect responses to operational owners:

  • Emergency readiness: Can you identify the evacuation routes, assembly points and required procedures?
  • Access control: Do you know how passes, visitors and after-hours entry are managed?
  • Workplace hazards: Have you seen trip risks, unsafe storage or blocked paths?
  • Privacy: Can you conduct sensitive conversations and handle confidential documents appropriately?
  • Cybersecurity: Do you know the correct process for devices, networks and data?
  • Recovery: Do you understand the response if power, systems or building access fail?

Use a scale from not at all confident to very confident, with an optional comment field asking for the location and description of any concern. Ask these questions after employees have used the new site, then repeat them after corrective actions. Segment results by floor, shift, visitor-facing role and access requirements, since a reception team and an after-hours worker face different risks.

Anonymous responses support more accurate reporting, particularly when employees worry that raising a concern could reflect badly on a manager or team. Route urgent hazards to facilities immediately rather than waiting for the survey review.

A legal firm may test whether client files and conversations remain protected. A healthcare provider could assess confidence in patient-data handling. A financial services business may need confirmation that security controls were re-established after equipment and records moved.

High confidence does not prove compliance. HR, facilities, IT and compliance owners must verify the relevant controls separately, record corrective actions and explain changes in plain language. The survey should show where employees need clearer instructions, while audits confirm whether the building and systems meet required standards.

8. Collaboration, Team Cohesion and Cross-Departmental Interaction Impact

A relocation changes who sits near whom, how easily employees find meeting space and whether informal conversations happen naturally. Ask about specific work situations rather than using “collaboration” as an unexplained headline.

A marketing agency might ask whether creative staff can work together without disturbing focused work. An engineering firm could assess whether project teams are better connected. A corporate headquarters may want to know whether departments that previously worked in silos now exchange information more easily.

Use a combination of ratings and scenarios:

  • How easy is it to collaborate with your immediate team?
  • Can you find a meeting room when you need one?
  • Are meeting rooms suitable for the work you conduct?
  • Are you closer to the teams you work with most?
  • Do you have useful informal interactions during the workday?
  • Does the layout support both focused work and group work?

Measure quality, not just frequency

A high number of meetings doesn't prove that collaboration improved. Ask whether interactions help employees solve problems, make decisions or generate ideas. Segment responses by customer-facing, backend, creative and administrative teams, because each group may use the office differently.

Include seating-model questions before the move. Ask how often employees expect to work on-site, whether they need assigned or shared workpoints, and which teams require proximity. The CBRE survey's finding that 52% was average utilisation across the week and 67% on peak days reinforces the need to measure uneven occupancy rather than rely on a single headcount assumption.

The Victorian Government's Hybrid Work Opportunities in Regional Victoria report used a 34-question survey instrument covering hybrid and remote work, work location, relocation patterns and work habits. Its approach shows why location, movement and work habits should be captured as structured fields rather than buried in a general comment.

For practical move coordination, connect the findings to a business moving checklist, especially where department proximity, furniture positioning and phased access affect collaboration.

9. Support Services, Facilities Management and Ongoing Relocation Issues

The relocation remains unfinished if the new office cannot be maintained reliably. Cleaning, heating and cooling, lighting, bathrooms, kitchens, parking, reception and repairs all shape daily usability after the move.

Survey these services separately rather than combining them into one facilities score. Ask employees to rate each service on a consistent scale, then ask how easy it is to report a fault and whether the correct team responds. This separates a clean workplace from one where broken air conditioning remains unresolved.

Use the first post-move survey to identify defects and confusing processes. Repeat selected questions after corrective work to check whether service quality improved. Segment results by floor, department and work pattern where privacy allows, since parking, reception and kitchen access may affect groups differently.

A Melbourne office-park tenant might rate maintenance response highly while still finding parking instructions unclear. A corporate team may accept the layout but report poor cleaning. Those findings require different owners, suppliers and target dates.

Track the operational details behind each response:

Reporting route: Do employees know where to submit a facilities issue?
Responsiveness: How satisfied are they with the time before someone responds?
Resolution: Was the issue fixed, or only acknowledged?
Recurrence: Has the same fault returned?
Priority: Which unresolved issue affects work most?
Staff support: Do facilities teams have enough capacity to maintain the new space?

Use a service-quality rating alongside a location field, such as floor, room or shared area. Ask facilities staff the same themes from their perspective, including workload, supplier coordination, access and recurring defects. Their responses can identify capacity constraints that employee ratings alone cannot explain.

Maintain an issue register tied to survey themes. Record the owner, target date, status and confirmation that the employee-facing problem is resolved. This turns feedback into service measures and shows whether follow-up work improved the workplace.

10. Overall Relocation Satisfaction and Likelihood to Recommend New Location

A single overall measure helps leaders track the relocation experience, but it shouldn't replace the detailed questions above. Ask, “How likely are you to recommend this office location to a friend or colleague?” on a 10-point scale, then follow with, “What would improve your rating?”

This format identifies a headline result and gives employees room to explain it. Someone may recommend the building because it supports collaboration while still criticising parking. Another person may like the facilities but find the commute difficult. The follow-up prevents management from treating one score as a complete diagnosis.

Measure change over time

Survey at 1 month, 3 months and 6 months after the move if the organisation can act on the results. Segment the findings by department, tenure and work arrangement, including on-site and remote employees. Don't compare groups without enough responses to protect anonymity and avoid misleading conclusions.

A technology company might use the result to assess whether the new location supports recruitment messaging. A professional services firm could track whether initial frustration declines after meeting-room and access problems are fixed. A facilities team may use the score as one performance indicator alongside issue-resolution records and operational measures.

Australian workforce data gives this question a useful retention context. ADP reported that only 16% of Australian employees were fully engaged, down from 18% the previous year, with engagement at 17% for office or on-site workers, 15% for hybrid workers and 7% for remote workers. The same research found that 21% had complete freedom to choose where they worked in the 2025 Australian workforce engagement findings. These figures don't prove that a relocation caused engagement changes, but they support asking whether the new office and work-location expectations affect commitment.

Share the result transparently. Explain what management will change, what requires a longer property decision and what can't change immediately. For post-move presentation and maintenance, a move-in and move-out cleaning checklist can help teams define the standard employees should expect.

10-Point Office Relocation Survey Comparison

Measure / Focus Implementation Complexity 🔄 Resource Requirements ⚡ Expected Outcomes ⭐📊 Ideal Use Cases 💡 Key Advantages
Employee Satisfaction with New Office Location and Facilities Low–Medium 🔄: standard survey design, segmentation Low ⚡: survey tools, HR time ⭐📊 Actionable feedback on comfort, amenities; retention signal Post-move 2–4 weeks; all office relocations Direct sentiment data; ROI justification
Communication and Change Management Effectiveness During Relocation Medium 🔄: multi-stage measurement (pre/mid/post) Medium ⚡: comms team, channels, tracking ⭐📊 Better buy-in; reduced anxiety and disruption Large moves, regulated orgs, complex timelines Reveals gaps; improves transparency
Impact on Productivity and Operational Continuity Post-Relocation High 🔄: requires baselines and longitudinal tracking High ⚡: ops/IT metrics, analytics tools ⭐📊 Quantified downtime, operational risks, ROI impact Customer-facing centers, firms with uptime needs Identifies process/IT bottlenecks early
Accessibility and Commute Impact of New Office Location Medium 🔄: geographic segmentation and commute analysis Low–Medium ⚡: commute data, mapping tools ⭐📊 Insights on recruitment/retention and work-life balance Moves between CBD/suburbs; large distributed staff Highlights commute-related retention risks
Technology Infrastructure and IT System Functionality in New Space High 🔄: technical testing, site surveys, validation High ⚡: IT staff, site survey tools, vendor support ⭐📊 Verified connectivity, reduced productivity loss Tech-heavy teams, remote collaboration needs Prevents prolonged IT outages; prioritizes fixes
Cost and Budget Impact of Office Relocation Process Low–Medium 🔄: communicative framing and perception measurement Low ⚡: finance/HR input, simple survey ⭐📊 Employee view of ROI and spending acceptability High-cost relocations; skeptical staff groups Improves transparency; frames financial messaging
Safety, Security, and Risk Management in New Location Medium–High 🔄: compliance checks and procedural validation Medium ⚡: security/compliance resources, audits ⭐📊 Confidence in safety, regulatory compliance Healthcare, legal, finance, sensitive-data environments Identifies security gaps; reduces liability
Collaboration, Team Cohesion, and Cross-Departmental Interaction Impact Medium 🔄: mix of surveys and observational measures Medium ⚡: HR, facilities, targeted interviews ⭐📊 Insights on space-driven collaboration and knowledge flow Creative agencies, cross-functional teams Informs layout optimization; boosts innovation
Support Services, Facilities Management, and Ongoing Relocation Issues Low–Medium 🔄: reporting systems and follow-up workflows Medium ⚡: facilities team, ticketing systems ⭐📊 Faster issue resolution; improved daily operations New builds, multi-tenant sites, handover periods Prevents small problems escalating; improves comfort
Overall Relocation Satisfaction and Likelihood to Recommend New Location Low 🔄: single NPS-style metric with follow-up Low ⚡: simple survey, analysis ⭐📊 High-level KPI for leadership; trendable satisfaction Executive reporting; employer branding Simple, meaningful metric; easy to track over time

Turn Survey Responses Into Move Improvements

Survey responses only create value when someone turns them into a decision. Start by reviewing patterns by department, location zone and work arrangement. A low overall score matters, but a concentrated problem can be more useful. For example, poor meeting-room access in one team may need a layout adjustment, while a commute concern affecting many employees may require changes to attendance expectations, parking support or transport information.

Separate immediate fixes from decisions that need property, finance or workplace-design approval. Replace missing signage, correct desk allocations, repair connectivity and clarify reporting routes quickly. Treat a change to floorplate, lease timing, seat-sharing ratios or private-space provision as a longer-term decision that needs evidence from several data sources.

Assign every action to a named owner with a deadline. Facilities may own temperature and cleaning issues. IT may own Wi-Fi and phone problems. HR may own communication, accessibility and work-arrangement concerns. A relocation manager should maintain one action register so that employees don't have to repeat the same complaint to several teams.

Pair every rating question with one precise open-ended follow-up. “What would improve your rating?” is stronger than a blank invitation to comment because it directs attention towards an actionable improvement. Keep the open field optional, protect anonymity where appropriate and avoid asking for personal details that aren't needed for segmentation.

Pre-move baselines give post-move scores meaning. Ask employees what they expect before the move, then ask whether the new office delivered that experience. Managers can distinguish a genuine decline from an expectation that was never realistic, and they can identify benefits that employees value but leadership didn't anticipate.

Hybrid work has also changed the planning problem. Australian office research found that 83% of organisations ranked location as their top priority when renewing a lease, while the same research reported 72% planned to increase investment in space design and fit-outs over the next five years. The evidence supports asking about experience, amenities, seating and layout before finalising a move, not just asking whether employees can attend the new address.

Australian relocation planning guidance also recognises that hybrid moves can require more preparation than traditional furniture transfers because organisations may shrink footprints, redesign for collaboration and upgrade technology. Hybrid work office relocation guidance discusses planning periods that can extend 3 to 6 months longer than traditional moves, while straightforward moves may begin at least 8 weeks before relocation and fit-out projects may require 12 or more weeks. Use those figures as planning guidance, not as a substitute for a project-specific schedule.

Get n Go Removals Melbourne is relevant when the action plan includes coordinated office equipment handling, furniture disassembly and reassembly, protective equipment, furniture positioning, storage or move scheduling. A single point of contact can help connect the survey findings with practical access details such as lift dimensions, loading areas, stairs, security procedures, floor layouts and fragile or oversized items.

Close the feedback loop with a short update that names completed actions, work in progress and constraints. Then repeat the relevant survey questions after changes are made. Employees are more likely to give useful feedback when they can see that managers read the answers, made a decision and checked whether the decision improved the workplace.


Get n Go Removals Melbourne offers coordinated commercial relocations, office equipment handling, furniture disassembly and reassembly, protective packing, transport, storage and move scheduling. Visit Get n Go Removals Melbourne to discuss a relocation plan that connects your survey findings with practical, low-disruption moving support.